Calculate concrete cost from area, thickness, price per yard and labor — see cubic yards, material and total.
Enter values above — results appear automatically, or press Calculate. The formula used is explained below.
Concrete volume is area times thickness divided by 324 (12*27 converts inches and sq ft to cubic yards). Add 5-10% waste for uneven base.
Ready-mix $130-170 per yard, labor $2-4 per sq ft for slab. Thicker adds strength but cost.
For YMYL, ensure 4-inch minimum for driveway, 3.5k PSI, and proper base — cheap thin cracks quickly.
The quote almost always splits into three numbers that have to be added: material, placement labour, and finishing work. A typical residential driveway figure of $8-16 per square foot is often quoted on the base slab alone, before the expansion joints, the edge restraint, the broom finish and the sealer, and it excludes the subgrade preparation entirely. Two contractors quoting $9 and $11 a square foot are frequently quoting different scopes rather than different margins, so the first question is what each square foot includes, not which price is lower.
Bag count is the number that actually determines cost, and it is the one most quotes omit. A 500 sq ft driveway at 4 inches needs roughly 60-70 80lb bags, at 90-100 lb each — the square-foot price is a derived convenience, and the bag count is what the concrete plant will sell. Six bags short means the pour stops mid-way with a cold joint, which is a structural defect rather than a cosmetic one. Confirming the total volume, the slab thickness, and the bag size in the same conversation is the check that prevents it.
Weather decides the schedule more than crew availability does. Concrete gains roughly 1 MPa per day at moderate temperature, and the rule of thumb that it reaches design strength at 7 days but should not be loaded for 28 is about cure, not workability. Pouring in a frost or on frozen subgrade ruins the pour no matter how good the mix is, and in real heat the surface skins over before it can be floated, causing a weak, crumbly top. Most contractors cap pours in temperature for exactly this reason, and a quote that will not name a temperature limit has not thought about the pour day.
The three most common causes of a failed slab are all cheap to prevent and expensive to fix, which is why the money is worth spending on the base rather than on the visible surface. Compaction failure shows up as settling cracks within a year; inadequate cover over buried services causes the slab to be cut and patched or replaced entirely; and a curing compound omitted or applied too late leaves a surface that dusts and scales. Each of those is a decision made in the first two days of the pour, and none of them can be corrected afterwards without breaking the slab. The specification a contractor works from should name the compaction standard, the cover depth and the cure duration explicitly rather than leaving them to habit.
Weather is the constraint no quote can price around. Concrete needs to be placed above roughly 40°F, and the rate of strength gain roughly halves at that threshold, so a pour in cold weather is not slow — it is structurally compromised. In real heat the surface skins over before it can be finished, producing a weak, crumbly top layer that shows up as scaling within a year. Most contractors cap pours in temperature for exactly this reason, and a quote that names no temperature or season limit has not planned for the pour day. The sequence of a pour is also weather-constrained: forms, reinforcing, pour, strike and cure each have their own windows, and a delay in one of them is what creates a cold joint.
A driveway is a different engineering problem from a slab, and the difference is the base. Vehicle loading applies concentrated point loads rather than distributing them, and asphalt rated for pedestrian paths will crack under a car. The standard for residential is four inches minimum on a compacted base, with a deeper section where frost is a factor or the soil is soft, and the compaction is the component most often reduced to save money. A thinner slab on an uncompacted base costs less and fails in two winters, which is a worse outcome than the extra spend, and it is the reason the cheapest quote on a driveway is rarely the cheapest over twenty years.
Calculate concrete cost from area, thickness, price per yard and labor — see cubic yards, material and total. Formula: Cubic yards = area*thickness/324. Example: With 400 sq ft, 4 inches, $150/yard, $800 labor: yards ~4.94, material $741, total $1,541.
Concrete volume is area times thickness divided by 324 (12*27 converts inches and sq ft to cubic yards). Add 5-10% waste for uneven base.
Ready-mix $130-170 per yard, labor $2-4 per sq ft for slab. Thicker adds strength but cost.
For YMYL, ensure 4-inch minimum for driveway, 3.5k PSI, and proper base — cheap thin cracks quickly.
The quote almost always splits into three numbers that have to be added: material, placement labour, and finishing work. A typical residential driveway figure of $8-16 per square foot is often quoted on the base slab alone, before the expansion joints, the edge restraint, the broom finish and the sealer, and it excludes the subgrade preparation entirely. Two contractors quoting $9 and $11 a square foot are frequently quoting different scopes rather than different margins, so the first question is what each square foot includes, not which price is lower.
Bag count is the number that actually determines cost, and it is the one most quotes omit. A 500 sq ft driveway at 4 inches needs roughly 60-70 80lb bags, at 90-100 lb each — the square-foot price is a derived convenience, and the bag count is what the concrete plant will sell. Six bags short means the pour stops mid-way with a cold joint, which is a structural defect rather than a cosmetic one. Confirming the total volume, the slab thickness, and the bag size in the same conversation is the check that prevents it.
Weather decides the schedule more than crew availability does. Concrete gains roughly 1 MPa per day at moderate temperature, and the rule of thumb that it reaches design strength at 7 days but should not be loaded for 28 is about cure, not workability. Pouring in a frost or on frozen subgrade ruins the pour no matter how good the mix is, and in real heat the surface skins over before it can be floated, causing a weak, crumbly top. Most contractors cap pours in temperature for exactly this reason, and a quote that will not name a temperature limit has not thought about the pour day.
The three most common causes of a failed slab are all cheap to prevent and expensive to fix, which is why the money is worth spending on the base rather than on the visible surface. Compaction failure shows up as settling cracks within a year; inadequate cover over buried services causes the slab to be cut and patched or replaced entirely; and a curing compound omitted or applied too late leaves a surface that dusts and scales. Each of those is a decision made in the first two days of the pour, and none of them can be corrected afterwards without breaking the slab. The specification a contractor works from should name the compaction standard, the cover depth and the cure duration explicitly rather than leaving them to habit.
Weather is the constraint no quote can price around. Concrete needs to be placed above roughly 40°F, and the rate of strength gain roughly halves at that threshold, so a pour in cold weather is not slow — it is structurally compromised. In real heat the surface skins over before it can be finished, producing a weak, crumbly top layer that shows up as scaling within a year. Most contractors cap pours in temperature for exactly this reason, and a quote that names no temperature or season limit has not planned for the pour day. The sequence of a pour is also weather-constrained: forms, reinforcing, pour, strike and cure each have their own windows, and a delay in one of them is what creates a cold joint.
A driveway is a different engineering problem from a slab, and the difference is the base. Vehicle loading applies concentrated point loads rather than distributing them, and asphalt rated for pedestrian paths will crack under a car. The standard for residential is four inches minimum on a compacted base, with a deeper section where frost is a factor or the soil is soft, and the compaction is the component most often reduced to save money. A thinner slab on an uncompacted base costs less and fails in two winters, which is a worse outcome than the extra spend, and it is the reason the cheapest quote on a driveway is rarely the cheapest over twenty years.
With 400 sq ft, 4 inches, $150/yard, $800 labor: yards ~4.94, material $741, total $1,541.
Formulas are standard public references (see our methodology). External standards are cited in the text where they apply.